Send Message
products

High Safety Casing Rotator equipped with power station for Secant pile wall, Barrier clearance,Pitching of pile

Basic Information
Place of Origin: China
Brand Name: SINOVO
Certification: CE/GOST/ISO9001
Model Number: TR1305L
Minimum Order Quantity: 1 unit
Packaging Details: International Export Package
Delivery Time: ON STOCK
Payment Terms: T/T&L/C
Detail Information
Application:: Bored Pile, Secant Pile Wall, Barrier Clearance,Pitching Of Pile Hydraulic System:: Rexroth And Kawasaki
Core Components: PLC, Engine, Pump Drill Accessories: DW Casing, Impact Hammer.
Power Station: Mobile Power Station Warranty: 2000 Working Hours Or One Year
High Light:

drilling equipment

,

foundation drilling equipment

,

foundation drilling


Product Description

High Safety Casing Rotator for Secant pile wall equipped with power station TR1305L, 

When the strata conditions are unstable, Casing is required to be driven to overall depth to prevent hole's collapse.

It is called Al Casing methodBenoto Method, Shaft Driling). To drive the Casing and retract it after concreting, Casing Rotator is strongly recommended to use.

With its superioirotating torque and ifting force, the machine shows the best performance of driving and retracting the casing. If it is used together with HammerGrab, it shows the fast excavating speed with its big volume of jaw and it is available for excavating gravels and boulders layer.

 

Casing Rotator is capable of driving casing into rock strata with strong torque and strotating mechanism.This benefit let the Casing Rotator be able to apply for various piling application sucecant Pile and Re-modeling Pile;

 

The advantages of adopting the casing rotator for construction

1) No noise, no vibration, and high safety;

2) Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;

3) During construction drilling, the characteristics of stratum and rock can be directly distinguished;

4) The drilling speed is fast and reaches about 14m/h for the general soil layer;

5) The drilling depth is large and reaches about 80m according to the situation of soil layer;

6) The hole forming verticality is easy to master, which can be accurate to 1/500;

7) No hole collapse will be caused, and the hole forming quality is high.

8) The hole forming diameter is standard, with little filling factor. Being compared with other hole 

forming methods, it can save a lot of concrete usage;

9) The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.

 

 TR1305L

Working device

Diameter of drill hole

mm

Φ600-Φ1300

Rotary torque

KN.m

1770/1050/590

Rotary speed

rpm

1.5/2.6/4.5

Lower pressure of sleeve

KN

Max.360KN+Dead weight190KN

Pulling force of sleeve

KN

2690

Pressure-pulling stroke

mm

500

Weight

ton

25

Hydraulic power station

Engine model

 

Y2-280M-4

Engine Power

Kw/rpm

2*90/1480

Weight

ton

4

Control mode

 

Wired remote control

 

High Safety Casing Rotator equipped with power station for Secant pile wall, Barrier clearance,Pitching of pile 0

 

 

Contact Details

Phone Number : +8613466631560

WhatsApp : +8613801057171