Place of Origin: | China |
---|---|
Brand Name: | SINOVO |
Certification: | CE/GOST/ISO9001 |
Model Number: | TR2005H |
Minimum Order Quantity: | 1 set |
Price: | Negotiation |
Packaging Details: | International Export Carton Case Package |
Delivery Time: | 7-10 work days |
Payment Terms: | L/C, D/A, D/P, T/T |
Supply Ability: | 30 set per month |
Name: | Full-Casing Method 2000mm Diameter Bored Piling Casing Rotator | Model: | TR2005H |
---|---|---|---|
Certification: | CE/GOST/ISO9001 | Diameter: | 1000-2000mm |
Rotary Torque: | 2965/1752/990 Instantaneous 3391 KN.m | Rotary Speed: | 1.0/1.7/2.9rpm |
Engine Model: | Cummins QSM11-335 | Engine Power: | 272/1800Kw/rpm |
High Light: | 2000mm piling rotator,2000mm full casing rotator,1800Kw piling rotator |
Introduction to construction method
The casing rotator is a new type drill with the integration of the full hydraulic power and transmission, and the combination control of machine, power and fluid. It is a new, environmentally-friendly and highly efficient drilling technology. In recent years, it is widely adopted in the projects such as the constructions of urban subway, articulation pile of deep foundation pit enclosure, clearance of waste piles ( underground obstructions ), high-speed rail, road and bridge, and urban construction piles, as well as the reinforcement of reservoir dam.
The successful research of this brand new process method has realized the possibilities for the construction workers to conduct the construction of casing pipe, displacement pile, and underground continuous wall, as well as the possibilities for the pipe-jacking and shield tunnel to pass through the various pile foundations without barriers, when the obstructions, such as the gravel and boulder formation, cave formation, thick quicksand stratum, strong necking down formation, various pile foundation and steel reinforced concrete structure, are not removed.
The construction method of casing rotator has successfully completed construction missions of more than 5000 projects at places of Singapore, Japan, Hongkong District, Shanghai, Hangzhou, Beijing and Tianjin. It certainly will play a bigger role in the future urban construction and other pile foundation construction fields.
( 1 ) Foundation pile, continuous wall:
( 2 ) Drilling gravels, boulders and karst caves
( 3 ) Clear the underground obstructions
( 4 ) Cut the rock stratum
( 5 ) Deep excavation
Technical parameters
TR2005H | |||
Working device | Diameter of drill hole | mm | Φ1000-Φ2000 |
Rotary torque | KN.m | 2965/1752/990 Instantaneous 3391 | |
Rotary speed | rpm | 1.0/1.7/2.9 | |
Lower pressure of sleeve | KN | Max.600KN+Dead weight260KN | |
Pulling force of sleeve | KN | 3760 Instantaneous 4300 | |
Pressure-pulling stroke | mm | 750 | |
Weight | ton | 45+(selection and installation of track)9 | |
Hydraulic power station | Engine model | Cummins QSM11-335 | |
Engine Power | Kw/rpm | 272/1800 | |
Full consumption of engine | g/kwh | 216(when the maximum power rate) | |
Weight | ton | 8+(Walking wheels are optional) 0.3 | |
Control mode | Wired remote control |
Quantity(Sets) | 1 - 1 | >1 |
Est. Time(days) | 30 | To be negotiated |