Home ProductsCasing Rotator

Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles

Certification
Good quality Waterwell Drilling Rig for sales
Good quality Waterwell Drilling Rig for sales
Simple operation.reduce cost ,our workers very like XYT-2B Drilling rig. beijing sinovo is a reputable company, we look forward to next cooperation.

—— Civil Works Consulting Enginee

Hello, I am Mok clarance form Singapore ,We bought TR138D rotary drilling rig from beijing sinovo . best quanlity, lowest price, Thanks a lot!

—— TEG FAR EAST LTD

Fast inquiry whatsapp 008613801057171

—— Fast inquiry whatsapp

Hi,This is Hotak from Afghanistan. We bought the water well drilling rig SIN300-II from SINOVO. Now it is the third year.Our machine runs very well.

—— Hotak

We ordered some ACCESSORIES FOR DRILLING RIG ,and the quality is very good,delivery fast and good service.

—— AYED

We ordered one unit TR200D Rotary Drilling Rig this year,the sinovo company provided a very good service and fast delivery time.we are so satisfyingly

—— PT

I'm Online Chat Now

Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles

China Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier
Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles supplier

Large Image :  Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles

Product Details:

Place of Origin: CHINA
Brand Name: SINOVO GROUP
Certification: CE/GOST/IS9001
Model Number: TR1305L/TR1505/TR2005/TR2605H

Payment & Shipping Terms:

Minimum Order Quantity: ONE UNIT
Packaging Details: nude
Delivery Time: ON STOCK
Payment Terms: L/C or T/T
Contact Now
Detailed Product Description
Main Structure: Wedge Clamping Device; 4sets Of Motor Reducer; Vertical Device; Caliber Change Device; Auxiliary Clamping Device; Work Traveling Device; Rorary Drill And Casing Rotator: Combination Construction Method

Full Hydraulic Casing Rotator Highly Efficient For Urban Construction Piles

 

1. Introduction to construction method

 

The casing rotator is a new type drill with the integration of the full hydraulic power and transmission, and 

the combination control of machine, power and fluid. It is a new, environmentally-friendly and highly efficient drilling technology. In recent years, it is widely adopted in the projects such as

 the constructions of urban subway, articulation pile of deep foundation pit enclosure, clearance of waste 

piles ( underground obstructions ), high-speed rail, road and bridge, and urban construction piles, as well 

as the reinforcement of reservoir dam.

The successful research of this brand new process method has realized the possibilities for the 

construction workers to conduct the construction of casing pipe, displacement pile, and underground 

continuous wall, as well as the possibilities for the pipe-jacking and shield tunnel to pass through the 

various pile foundations without barriers, when the obstructions, such as the gravel and boulder formation, 

cave formation, thick quicksand stratum, strong necking down formation, various pile foundation and steel 

reinforced concrete structure, are not removed.

The construction method of casing rotator has successfully completed construction missions of more than 

5000 projects at places of Singapore, Japan, Hongkong District, Shanghai, Hangzhou, Beijing and Tianjin. 

It certainly will play a bigger role in the future urban construction and other pile foundation construction 

fields.

 

( 1 ) Foundation pile, continuous wall:

l Foundation piles for high-speed rail, road and bridge and house building.

l Articulation pile constructions which are required to be excavated, such as subway platforms, 

underground architectures, continuous walls

l Water retaining wall of reservoir reinforcement.

( 2 ) Drilling gravels, boulders and karst caves

l It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder 

formations.

l It is allowable to conduct operation and cast the foundation piles at he thick quicksand formation and 

necking down stratum or the filling layer.

l Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.

( 3 ) Clear the underground obstructions

l During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced 

concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the

 foundation pile on the spot.

( 4 ) Cut the rock stratum

l Conduct the rock-socketed drilling to the cast-in-place piles.

l Drill through-holes on the rock bed (shafts and ventilation holes)

( 5 ) Deep excavation

l Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement.

l Excavate deep wells for construction use in the constructions of reservoir and tunnel.

 

2. The advantages of adopting the casing rotator for construction

 

1) No noise, no vibration, and high safety;

2) Without mud, clean working surface, good environmental friendliness, avoiding the possibility for 

mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;

3) During construction drilling, the characteristics of stratum and rock can be directly distinguished;

4) The drilling speed is fast and reaches about 14m/h for the general soil layer;

5) The drilling depth is large and reaches about 80m according to the situation of soil layer;

6) The hole forming verticality is easy to master, which can be accurate to 1/500;

7) No hole collapse will be caused, and the hole forming quality is high.

8) The hole forming diameter is standard, with little filling factor. Being compared with other hole 

forming methods, it can save a lot of concrete usage;

9) The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about

 3.0cm.

 

Contact Details
Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.

Send your inquiry directly to us (0 / 3000)